Bayshore Shopping Centre Parking Garage

Project Name: Bayshore Shopping Centre Parking Garage Location: Ottawa, ON Year: 2016 Concrete Supplier: Hanson RM Project Scope: 4 level parkade with 3’ thick raft slabs Type of cement used: T-GUL SCMs: 40 to 60% slag and 40mm limestone Exposure Class: C1 Concrete Design Strength: 35-55 MPa Amount Used: ~64,000 m³ poured by Hanson RM […]

Highway 401 and Hurontario Off-Ramp

Project Name: Highway 401 and Hurontario Off-Ramp Location: Mississauga, ON Year: 2010 Project Owner: Ministry of Transportation of Ontario Concrete Supplier: Dufferin Construction Project Scope: 500 linear metre section, one lane wide Type of cement used: 75% Type GUL SCMs: 25% slag Concrete Design Strength: 30 MPa w/air concrete, tested for AVS, RCP, Salt Scaling, […]

Highway 6 and 403 Overpass

Project Name: Highway 6 and 403 OverpassLocation: Hamilton, ONYear: 2017Project Owner: Ministry of Transportation of Ontario (MTO)Concrete Supplier: Dufferin ConcreteProject Scope: Highway OverpassType of cement used: 75% Type GULSCMs: 25% slag cementConcrete Design Strength: 30 MPa w/air concrete patch work mix design, meeting AVS and RCP (<2500C)Additional Details: MTO Night work Project

Inkster Boulevard

Project Name: Inkster Boulevard Location: Winnipeg, MB Year: 2018 Project Scope: Concrete road, 230mm thick plain jointed concrete pavement Type of cement used: GUL

Highway 3 – Concrete Section

Lower Carbon Concrete Case Study: Highway 3

Project Name: Highway 3 Location: Windsor/Essex, ON Year: 2023 Project Owner: Ministry of Transportation of Ontario Contractor: Green Infrastructure Partners Designer: Golder Associates (now WSP) Project Scope: 7.9 kilometre, 2-lane section of highway pavement Type of cement used: GUL SCMs: 25% slag Exposure Class: C-2 Concrete Design Strength: 32 MPa at 28 days Amount Used: […]

Essex Roundabout

Lower Carbon Concrete Case Study: Essex Roundabout.

Project Name: Essex Roundabout Location: Essex, ON Year: 2024 Project Owner: County of Essex Contractors: Green Infrastructure Partners Project Scope: Concrete Roundabout Type of cement used: GUL SCMs: 25% slag Exposure Class: C-2 Concrete Design Strength: 32 MPa at 28 days Amount Used: 7,000 m³ Photos courtesy of County of Essex Project Photo Library